Hamilton, ON
Babcock & Wilcox

Walters scope of work involves erecting the steel structures surrounding the blast furnace gas-fired B&W TSSG boiler and auxiliary equipment for a local company in Hamilton, Ontario.

Our Role

Walters is fabricating and installing 280 tons of structural and miscellaneous steel for a local Hamilton project.

Facts & Figures

  • 280 tons of steel and miscellaneous steel
  • 68’ tall truss columns
  • 17′ x 9′ x 56′ stair tower, installed in one piece

Overcoming Challenges

Coordinating efforts with the boiler manufacturer and the other subtrades on a very tight construction site will be important to ensure a safe and on schedule erection.

Location

Hamilton, ON